Skip Navigation
More for small businesses & trades

Free template · for contractors & trades

Free Change Order Form

A change order form that records only the change and its price leaves the customer signing a small number in isolation, and moves the surprise to the final invoice. This one carries the running contract math: the original contract, everything approved before today, this change, and the new contract amount. It is the page a job needs the moment somebody says “while you’re in there” — free, fillable, and unbranded.

Take it with you — free, no signup

Direct download. No email, no account — just the files.

What it does

  • Records one change to an authorized job: what is added, removed, or substituted, and where.
  • Carries the running contract math on the page — A the original contract, B everything approved before today, C the subtotal, D this change, E the NEW CONTRACT AMOUNT the customer signs.
  • Calculates lines C and E for you in Adobe Acrobat Reader and most desktop PDF readers; the arithmetic is printed beside each line so the page works in any viewer.
  • Captures the schedule impact in calendar days and the revised substantial-completion date — the detail that is easiest to skip when a change feels minor.
  • Comes with a second copy shown filled in for an invented bathroom remodel, so you can see how much detail is enough before you write your first one.
  • White-label — a contractor change order template with no branding anywhere on it, so you can print it on your own letterhead and hand it to a customer as your own.

Own it, don't rent it

Want the whole job, not just one change?

This free page handles one change. The full pack is sixteen documents sequenced to a job’s timeline — work authorization and scope, deposit and payment schedule, materials allowances, site conditions, the Change Order Log that carries the running total across the whole job, time-and-materials authorization, unforeseen-condition and delay notices, the subcontractor sheet, substantial completion and punch list, closeout, warranty, callbacks, a late-payment ladder and a photo release — each as a fillable PDF and an editable Word file, with a 48-page guide and a 44-moment router.

A one-time purchase you keep and reuse on every job — the paperwork shelf between a free single form and a rented monthly contractor app.

A general template and business reference, not legal advice, and downloading it does not create a lawyer-client relationship. Residential construction is regulated at state and often city level — written-contract requirements, licensing, deposit caps and cancellation rights all differ. Have a construction attorney in your own state read your contract documents once before you rely on them. Free to use; please don’t resell or redistribute.